Time-sensitive artifacts tied to the 3I/ATLAS Jupiter encounter. These pieces document specific predictions and observational targets. Limited production run aligned with campaign timeline. Signal begins with silence.
Time-sensitive artifacts tied to the 3I/ATLAS Jupiter encounter (March 2026). These pieces document specific predictions and observational targets outlined in DOI: 10.59332/jbis-079-03-0038. Limited production run aligned with campaign timeline.
Target 5B (Z-Axis Shift) remains CLASSIFIED pending observational confirmation. A locked product is more compelling than an absent one. The drop architecture is intentional and sequential.

Target 5B: Polar Crank maneuver schematic
This artifact documents Target 5B: the predicted 90° Z-axis plane change maneuver. Release contingent on Jupiter encounter data.